These works involved reconstruction of a heavily sunken road caused by a landslide. Walsh worked closely with the designer to assess the design as the works progressed and to pro-actively respond to design changes. The carriageway was constructed with grass grid reinforcement membrane placed between surfacing layers.
Close liaison with Statutory Water Authority who replaced a water main during the Contract.