This contract involved constructing the foundation and drainage to the New Motor Transport Workshop at the Innsworth establishment. The works included very high tolerance internal floor slabs laid with specialist laser screeding equipment. The external concrete slabs of 4000m2 were laid in pours of up to 700m2/day. The contract included a large sustainable drainage soakaway system and associated storm drainage works from the building, with petrol interceptors and Heavy Duty channel drainage.