The works involved S278 road construction to form the new entrances into the fire station. New drainage was installed to the existing Shepherd Road and Tuffley Road. New entrances were excavated, kerbed and surfaced. Footpaths were constructed with pedestrian crossings, and a new cycle way was built adjacent to the station. Walsh sub contracted works for the new street lighting, the electrical connections and carriageway line marking.Wig Wag warning signs were erected on the existing highway with considerable ducting of the electrical system back to the new fire station building. These works involved intricate Traffic Management of the busy carriageway