The project involved constructing a new roundabout along the existing A44 at Fladbury. A considerable fill operation was necessary to bring the levels up approx. 1.5m with heavy plant and compaction equipment. The site had highway drainage connected to a large soakaway system within the Client’s land.
Modern kerb drainage systems were installed together with standard kerbs, highway footpaths, and street lighting ducting. The installation of road signs, highway lighting, vehicle barriers and roadmarking also were carried out.
The contract included intricate Traffic Management and programming to deliver the scheme on time.