Full demolition and reconstruction of brick arched bridge with Asset Steel culvert arch and concreting works. Bridge works involved working within live river which periodically was under flood conditions and various water pumping methods were employed. The steel structure was back filled with concrete and brickwork arches were constructed with final surface course, and verge works.