You are here: Home » Projects » Windcross Bridge

Windcross Bridge

Project Details

Category
Riverworks
Client
Amey/GCC
Value
£143,000
Period
15 weeks


The Brief

Full demolition and reconstruction of brick arched bridge with Asset Steel culvert arch and concreting works. Bridge works involved working within live river which periodically was under flood conditions and various water pumping methods were employed. The steel structure was back filled with concrete and brickwork arches were constructed with final surface course, and verge works.

360 Images

Looking for a Civil Engineering Contractor for your next project?
Call us now on 01905 350053